Fe scheme 3
Notes
- First step taken from NIST.
- Second step investigated but further properties still unknown.
- Efficiency at RISIKO mass separator facility: 10(1)%
Scheme
Ionization Potential: 63737.704 cm⁻¹ (NIST ASD, 2024)
Lasers used: Ti:Sa
Scheme table
Step | λ (nm) | From (cm⁻¹) | Term | To (cm⁻¹) | Term |
---|---|---|---|---|---|
1 | 252.361 | 0.000 | 39625.804 | 5D4o | |
2 | 414.590 | 39625.804 | 5D4o | 63746.000 |
Scheme drawing
Download scheme drawing
Saturation curves
Saturation curve FES
Saturation curve taken at RISIKO mass separator facility Mainz. Power measured before window to RISIKO and reflection from window subtracted.
Download saturation curve
Saturation curve SES
Power measured before window to RISIKO. Reflection from window insignificant at this wavelength.
Download saturation curve
References
Submitted by
Thorben Niemeyer