Skip to content

Fe scheme 3

Notes

  • First step taken from NIST.
  • Second step investigated but further properties still unknown.
  • Efficiency at RISIKO mass separator facility: 10(1)%

Scheme

Ionization Potential: 63737.704 cm⁻¹ (NIST ASD, 2024)
Lasers used: Ti:Sa

Scheme table

Step λ (nm) From (cm⁻¹) Term To (cm⁻¹) Term
1 252.361 0.000 39625.804 5D4o
2 414.590 39625.804 5D4o 63746.000

Scheme drawing

fe scheme, light mode fe scheme, dark mode

Download scheme drawing

Light color Dark color
PDF , PNG , SVG PDF , PNG , SVG

Saturation curves

Saturation curve FES

Saturation curve taken at RISIKO mass separator facility Mainz. Power measured before window to RISIKO and reflection from window subtracted.

Saturation curve FES, light mode Saturation curve FES, dark mode

Download saturation curve

Data table Light color Dark color
CSV PDF, PNG, SVG PDF, PNG, SVG

Saturation curve SES

Power measured before window to RISIKO. Reflection from window insignificant at this wavelength.

Saturation curve SES, light mode Saturation curve SES, dark mode

Download saturation curve

Data table Light color Dark color
CSV PDF, PNG, SVG PDF, PNG, SVG

References

Submitted by

Thorben Niemeyer